EnviGlobe

Waste Management

ADES Waste Management Project

Management, transportation, and safe disposal of hazardous and non-hazardous waste generated from ADES facilities.

Illustrative environmental engineering and infrastructure context in Egypt
Illustrative image only; it does not depict the actual project.
ClientADES Group
CompanyADES Group
LocationRed Sea and South Sinai, Egypt
DurationOngoing since 2019

Background

ADES operates drilling assets in the Red Sea and South Sinai, generating hazardous and non-hazardous waste at locations where disposal infrastructure is distant and environmentally sensitive coastal and marine receptors are close. EnviGlobe has supported the operation since 2019, which makes this an operational service rather than a study.

Objective

Support ADES sustainability planning through safe waste management and regular HSE reporting.

Outcome

Since 2019 the arrangement has given ADES continuous, documented waste management across remote operating locations, with the reporting needed for sustainability disclosure. In sensitive coastal environments, the value is in the traceability: being able to show where every stream went, not simply that it was removed.

Standards and frameworks applied

  • Egyptian Waste Management Law 202/2020
  • Basel Convention
  • Egyptian Environmental Law 4/1994
  • Oil and gas industry HSE practice

Related services

Have a similar project?

Talk to EnviGlobe about the practical next step.

Request a consultation